Saturday, 2 February 2013

Jumbo Gets A Voice

All,

After a busy week at work & spending the last too many weekends working I decided that i needed some me time.  So Saturday & Sunday would be dedicated to some sort of advancement on the layout front.

With an invoice arriving late in the week from Auscision....it would seem the 422s are on the way & i found myself  mentally planning sound fitment to these locos.  I then pondered the fact that i had fallen behind on the present fleet...so the decision was made to carry out a conversion i had been putting off for ages....Sound for the Jumbo.

Surprisingly ( or not surprisingly ) which ever way you look at it, there is not a lot of info on the web regarding DCC & sound fitment to Aussie locos & in particular the earlier Austrains offerings.  Even though i appreciate what info is out there it does not go into great depth & expects some prior knowledge.

While i have fitted a fair few locos with DCC/Sound, I am certainly not an expert in this field but thought it might be fun to post my attempt at fitting DCC & Tsunami sound to an Austrains 442.  This saga will probably take a few posts to complete & I welcome you guys to come along for the ride.

Firstly I must state that i am a fan of Tsunami Sound & am trying to standardise on AT1000 decoders where possible.  In the case of the 442 where conversion is not as straight forward as some other locos...There may have been a more convenient decoder than an AT1000....but me being me... I will carry on regardless.

One last thing... as we go along please offer any info or advice as this may come in handy for me or anyone else intrepid enough to attempt the coversion.


When you remove the body...this is what you are faced with.  As much as the 442 does have an 8 pin plug for DCC fitment, the space available is limited & there is certainly not a lot of room if adding a decoder.  It must be said there is very little room ( read almost nil ) between the top surface of the chassis & the roof of the body.  In my case i have decided to fit an AT 1000 decoder so some modifications will need to be achieved.




       With the diecast weight removed from the chassis, all electrics removed & measurements taken...I have marked out what needs to be removed.





I set the weight up in the mill, removed the required material & have mated the modified weight back on the chassis to check clearances etc.  Of interest in this shot & more for people not experienced in DCC fitment...is the wiring.  If you compare this shot to an earlier one, you will notice that there are only six wires left remaining on the chassis & they are the bogie pick-ups ( 2 per bogie ) & in the centre are the Motor + & - wires.  Everything else has been tossed.  The headlights from each end have been removed & these will be replaced with LEDs at a later stage in the conversion. 




I now needed to fabricate a place for the decoder to sit & this design is based around the fact that when the weight was milled it exposed the top of the motor.  The material chosen will also give the decoder support & total electrical isolation from the weight.  The two layers( top & bottom of photo ) were laminated to give the shape i required



The decoder mounting plate has now been trial fitted & I will utilise VHB ( very high bond ) double sided gel tape to adhere this component to the weight... decoder fitment can then take place.




The AT1000  decoder is also trial fitted so clearances can be measured & to ensure all is well before rewiring takes place.

The clearance between weight/decoder & roof is paramount...

As can be seen there is now plenty of room for the decoder & associated connections.  The capacitor out of sight to the right of shot will be housed in the opening between the chassis & weight.  Speaker location will need to be decided & LEDs will be fitted in readiness.

So... this is as far as i have gone & if i can fly under Vanessa's radar for the next day or so i will commence wiring tomorrow...Will post again soon.

 

Friday, 25 January 2013

January Progress...

All,

Well what a month it has been & before going any further with this post I must take this opportunity to thank everyone who has supported us with the recent release of our Timber Tank Stand kit...  Since the initial release on the 3rd of this month we have now clocked up sales of ( a staggering ) 229 of these kits & it is certainly interesting when the sales split is examined.  30 sold on Ebay, 40 to a US hobby outlet, 42 sold to overseas customers, 20 to Warren at Gwydir Valley Models & the balance through direct sales.  One interesting aspect is that through email discussions with the overseas customers...the vast majority are not expats or building Aussie Layouts....Go figure.

While on the subject of the Timber Tank Stand kit....it has come to our attention that a couple of people have been confusing our kit with another supplier's offering.   To clarify our kits are supplied in a box marked plainly with Harlow Graphics Laser Rail Bits with all timber parts manufactured from Premium Basswood with the base etc being 3mm pre-machined acrylic.  We do not & will not ever contemplate utilising inferior or unsuitable materials for inclusion in any of our kits.

BTW... I am also hearing we may soon have some more choices of overhead tanks to fit on the stands????!!!!

Now on with the post...

Our latest incarnation planned for the Timber Bridge Range is approaching completion.  One of the key features we are always striving to improve upon is ease of construction while being very mindful of not compromising on the prototype in terms of scale, detail or general appearance.  Following on from the last post which talked about the girder & corbel incorporation at the deck level... we have looked at adopting the same methodology of the rest of the kit where possible & in particular the support "bents".  With the almost completed bridge sample in the attached shots we have trialled the use of  a one piece headstock, sill & pile assembly with the angle bracing being added separately.  We have also added simulated joins where appropriate  This of course means deviating from round piles in favour of square which was certainly not unknown in prototype...assembly time is certainly the winner being sped up significantly. 

So... as stated i have added some shots for perusal & as usual any comments ( good, bad or constructive ) are welcome.  It must be noted that the bridge still requires foundations, angle iron guardrail supports & nut bolt detail...I will post another instalment when these decided upon & added.

Have a Great Australia Day & Long Weekend!!! ....I just may spend some time on the layout....Yeah Right.




          

 



Sunday, 13 January 2013

Weekend Goings On...

All,

My daughter often says to me "Build A Bridge Dad!!!..." whenever i need to get over something.  So i took her advice and made a start over the weekend.

I took advantage of the somewhat cooler day today, cranked up the lasers & commenced catching up on replenishing existing kits & also looking at the plethora of foreign one off orders i also have to complete.

In between reloading the machines with timber i decided to also take a look at a structure design that has been on my mind for some time...that being a timber road bridge with angled approaches.  While i have some photos of prototype bridges, i only have drawings of the Wauchope example & with all of this info mentally pooled there was enough info to at least  make a start on a generic example.

As i have stated before...to my mind the magic of our latest kit rests with the one piece composite component of the column & bearer assembly & so as i perused the plans of the Wauchope road bridge it became apparent that this methodology could be adapted to this road over rail timber example which would reduce kit construction time markedly. 

The bridge in question is 5 Girders wide & if creating the components singularly this would equate to 15 individual girders... 5 each for either end wings & 5 for the central deck.  The first development drawings incorporated the girders as one piece....but upon further investigation & some laser trickery it was possible to not only machine each girder in it's entirety...but also to add the corbels as well.  I have now machined & built two samples with the decking installed & the results are promising....




Reproduced with kind permission of Greg Edwards, Datasheets.
The Datasheets drawing of the bridge in question...Of interest is that the prototype had a slight variation in length of the wings..... Again the Datasheets range is indispensible when checking details & dimensions....The hobby owes Greg a debt of gratitude.

Clicking on the photo should enlarge the image enough to peruse the girder & corbel detail.  The next few decisions with the kit will factor around height of the bents & the type of footings that are offered as there was significant variation with this type of bridge. 



Sample of  components for trial fitting...


Close up showing the simulated joins between the girders & corbels...


The components in question so far... the girders are one piece & incorporate the corbels with a laser cut line to indicate the join in components.  There is no need to add the but joint simulation where the girders join as these are hidden entirely when the deck posts are added.








The trial deck with girder assemblies installed...It may also be possible to utilise a one piece kerbing assembly as well with simulated joins as there are two each,  scale 9" x 5" laminated that are placed on either side of the decking....

I can see that with all of the incorporations that are possible... It will cut down assembly dramatically while still representing a dimensionally accurate, well detailed & durable scale example... The last thing we want to produce is a "box full of bits" type kit that upon opening takes away the inspiration to complete the kit.

Anyway that is progress to date on this kit & it will certainly be an addition to the upcoming bridge range. Both this & the flat deck bridge are being developed in unison ( and together as well!!! )....Will post progress as it occurs...

I will now need to look at double track styles before i start being labelled a "singletrackite"...

And one last thing before someone asks.....No... the layout is not getting any attention at all.

Regards,

Rod

Saturday, 5 January 2013

A "PC1" On Steroids

All,

As the mercury nudges towards 40 degrees... I found solace inside with the air-con cranked up & the cricket acting as background noise while researching some more local railwayana.  The subject of this second post for the day could also border on another Ripleys.

Picture yourself at an exhibition & you came across this cameo scene on someone's layout... Your first thoughts would probably be... has the guy gone mad!!!.  Well as is often the case with railway infrastructure sometimes fact is certainly stranger than fiction.



This scene only captured earlier this week is located next to the up main adjacent to the site of the long gone Goulburn North signal box & between the station proper & the Blackshaw Rd level crosssing which is just out of view to the right of shot.

The "buildings" are owned by the Goulburn Bowling Club & i believe are used for general storage & greenkeeping equipment.  Apart from the shemozzle of precast & weatherboard components... the origins of at least one of the items is very interesting.

The PC1 station building was ( widely believed ) salvaged from the site of Willigam on the long closed  Taralga Line.
Willigam was the first station reached on the branch,  after the Taralga Line branched from the Goulburn to Crookwell line at Roslyn.  Modifications to the original structure have taken place over the years as evidenced by the photograph.

For those interested Willigam was roughly 2 miles from Roslyn & the "station" consisted of a 120' platform with a PC1 station building for passenger accomodation located on the Up side of the line with a loop line on the down side.  There was a loading bank opposite the platform on the loop with a sleeper stage at the Taralga end of the loop.

The Taralga branch closed to traffic in May 1957 ( opened in Feb 1926 ) with the rails etc removed some time in 1959.  

The Crookwell line remained open until the last "commercial movement" to & from Crookwell from Goulburn in March 1984.

I hope this post does offer a source of inspiration for a cameo here & there that will take care of the bits & pieces we all accumulate in the modelling junk draw!!!  Certainly a great scene if modelled in low relief between the track & the backdrop.

Regards,
Rod



Ripley's...Believe It Or Not...

Hi All,

Yeh i know the post titles don't get any better...but i have a Ripley's story that is hard to believe.

I love to research out rail related industries, both from the rail & the social aspect. As most of my earlier life being spent living & working in Botany... I had researched the Botany Line to death... now living in Goulburn has given me a blank canvas & a different perspective on life...Suburban Vs Rural

This infatuation with research also aids my decision making process in the model room & layout building...although the research definitely takes up the time that could be spent on the layout...hmmm an enjoyable conundrum.

When i first started frequenting Goulburn well before i moved here, one of the dominant features of the trackside infrastructure & the skyline was the old flour mill. This mill & associated site has a history to be believed & has been a cornerstone of my research for the last few years.

I guess i should begin by "siting" the mill to put this story into perspective. The mill is situated immediately adjacent to the up main around 400 metres north of Goulburn Station on the up side of the main running lines, just beyond the Blackshaw Rd Level Crossing. The rear of the plant faces the railway while the front faces Sloane St.

From a railway perspective the flour mill was served by a dead end siding that was reached by shunting movements leaving the yard travelling north via the North Shunting Neck, (which paralleled the up main ) crossing over the level crossing then a hundred metres ( approx ) further on running through a set of trailing points which served the mill...from this point the shunting neck was known as the Weighbridge Rd & over the years this road was extended to a point just beyond the Cole St overbridge.....

Mill History...

The site originally was home to a fully enclosed public swimming baths that boasted gas lighting & a smokers room in the tower that was built & opened in 1892 & was designed by Goulburn architect E.C. Manfred who was also responsible for designing a fair few local landmark buildings.

The baths & site were sold in 1906 to William Connolly who already operated the Argyle Flour Mills elsewhere in Goulburn. He set about building a modern flourmill which incorporated the baths building in the finished mill. The actual pool was just covered over with floorboards & the building put to work.

At the time, the mill was one of the largest & most modern equipped mills in the country area of NSW. The Peerless brand of flour it produced was reputedly world renown for quality & was exported to a fair few overseas countries.

The mill survived into the early 1970s when closure took effect & in the late 70s the site was sold to a local family who after making some significant changes & additions to some buildings, installed a 14 lane Ten Pin Bowling Alley & the old public baths area was converted into a roller skating rink... Yes the mill was now a leisure centre!!!

Another transformation of the mill took place in latter years where the bowling alley was dismantled & removed & the whole building including the pool area was reopened by the same family as a retail furniture business.

The furniture business relocated to new premises at the beginning of 2011 & as i write this post the whole site is laying empty & for sale. While the main buildings are heritage listed it will be interesting to see what becomes of the site & associated buildings as it looks for another chapter in it's already incredibly diverse life.

For those who are interested... Yes the pool still exists under the floorboards of the building that housed it.  I have been priveleged to have stuck my head underneath the boards & witness this remarkable feature....still very much intact.

So... where else would a public baths have been transformed into an integral part of a flour mill...then the whole site play it's part as a leisure centre & later be the home of a furniture store???




This shot is taken from the Blackshaw Rd level crossing & shows the rear of the main mill building. Of interest is the single level building at left of shot extending along the street side with the tower in the distance.  This is the building that housed the original public swimming baths & later the roller skating rink







A wider shot this time showing the newer building addition at right of shot.  This building was added to house the bowling alley, plant room & other services







A view of behind the bowling alley addition showing all of what is left of the flour mill siding alignment & infrastructure.  There is evidence of loading dock remnants & steps etc below the wire fence in the middle of the shot



I would love to acknowledge credit  for this photo...but have no idea of the photographer etc...
While this shot may be out of sequence... it is a useful comparison with the next shot...
Taken from Sloane St is an overall view of the front of the site. I believe taken in around the early 1940s
The main mill building is obvious while the building at right housed the original public baths & later a roller skating rink.  The signwritten shed & the elevator / silo complex were demolished to make way for the new addition that housed the bowling alley & carpark.





Taken from the same location as the previous shot albeit some 70 odd years later...
 
The entrance to the original public baths is at far left adjacent to the tower which once contained the " smokers room"
The bowling alley was housed in the long building extending from centre to right of shot.
 
Visible on the roof of the main mill building is the support structure for the now removed water tank...While not visible in the previous shot it was added & removed in the intervening years.  

Sunday, 30 December 2012

A New Arrival...

All,

As alluded to in last night's post.... The Timber Water Tank Stand kits are complete & ready to go...Only 6 weeks late!!!....a marathon 4 day & night effort has the first run packed and awaiting their new homes.

A last minute order from the U.S. for a fair quantity of kits, destined for retail sale,  set the cat amongst the pigeons. I am told this style of water tank stand was used in some parts of the U.S. & as a casual observer of happenings over there...I was not in a position to argue the point.  They were added to the manufacturing list... are now on their way & do not impact on the local first run quantity available.


Kit Box Lid Graphics...


There are some details & changes to the kit i would like to cover in this post...

1. The replacement floor for the Casula Hobbies tank ( as discussed in an earlier post ) is now a feature of all kits.  It was just too difficult to predict which tank people would use in the long term... so why not just add it to all kits.

2. The one piece bearer & column assembly has been the main feature of this kit.  As basswood is relatively fragile we have lasered the components incorporating retaining frets & these will be supplied in 2 sheets each containing two assemblies per kit.  This should ensure that the components reach the customer undamaged...As stated in the kit instructions...care & patience needs to be taken when assembling these components as the bearer is oriented across the grain with the columns lasered along the grain.  Across the grain being the fragile plane... The only other option was to supply all the columns & bearers as individual components.  This option would entirely destroy the magic of this kit & would make accuracy in construction very difficult & tedious. When the components are installed to the base & the joists added, a very strong base is the end result.

   


3. The final retail price has caused me some angst & while i hoped to be able to send to market at under $35.00 inclusive... Reality has to come to the fore & we have had to adopt a price of $37.50 with an expectation of sales at around 250 units long term.... So the price will be $37.50....

For the moment we will remain selling on ebay & look at other avenues in the future.  We can announce though that this kit & soon the entire range will be available through Gwydir Valley Models....this should take effect when Warren reopens in mid January.

Kits Earmarked For Warren at Gwydir Valley Models...


For those of you who have emailed during the last few months regarding this kit....please accept this posting as a notice of the impending release of the kit.  We will allow the new year to ring in & then list on ebay around the 2nd January...To give those people a chance to catch up...

These kits are not a "limited edition".... they will be available on a permanent basis & if sales mean we exhaust our stock earlier than anticipated... do not worry there will be more available..... We will also be taking feedback for development of other designs of timber stands... There was plenty of variations & i have a feeling we may have more choices for tanks in the future???!!!

Even though we are a tiny player in the world of model railways...I am excited about this kit & hope that it fills a void in the market & means that all modellers who have had tank kits or completed units laying around in the " to do" bin can look forward to actually installing 1 or 2 completed water tanks & timber stands on their layouts..... It has been an enjoyable experience developing this kit!!!

Now To The Layout Room!!!!

Regards,
Rod
 


  

A Modelling Proposition...With Butter

All,

It has been a while between posts...A fact i have been reminded about quite a number of times.  One email arrived with the subject heading " Is Anybody There" & that was the sum total of the email!!!

The normal lead up to Christmas around here normally means that business drops off around 1st week of December as clients start to get into the festive mood & oil company budgets dry up & does not pick up again until late January... I like it like that!!!  Not so this year & indeed there is still a backlog of work which has only been tempered by an announcement that we were closing until mid January.  While not technically correct...This was the only way to buy some time to get the gestation period of at least one kit finalised & hopefully leave time to catch up with other matters.

To that end i can state that the Timber Elevated Tank Stand kits have been finalised with packing taking place today & should be completed tomorrow... There will be a separate blog post to deal with this issue tomorrow night. 

Now to the reason for this post...

There has been a lot written in the past couple of years about oil or petrol depots from a modelling perspective & this obviously has coincided with the multitude of releases of rail tank wagons.  Like any self respecting layout builder, I will
of course be adding at least 2 or 3 depots on my layout.  These additions will also be a labour of love as most of my earlier working life was spent in petroleum & petrochemical depots & terminals.

In the quest to research what is left of the local depots i came across another industry in Goulburn that was unintentionally intertwined with at least one oil depot.  This fascinating little branch ( should be classified as a twig ) or gaggle of sidings located within a hundred or so metres of Goulburn Station is steeped with industry & does present a very real possibility to be incorporated into at least my layout....

The location is just south of Goulburn Station ( on the down side of the mainline ) & branches off  the still utilised South Shunting Neck...although nowadays this neck really only serves as a non mainline link from the workshops & roundhouse to the yard ajacent to the station proper.  The branch leaves the neck via a facing point to the left, leaves the mainline corridor & travels down the left or eastern side of Bungonia Rd.  The branch once served at least 3 oil depots, a sawtooth shed that once housed an animal skin warehouse & a Butter Factory.

The only remnants left along this branch are the Mobil Depot ( in early days the Vacuum Oil Depot ) & the Butter Factory.  Sadly of course none are now served by rail with the branch truncating over the years & ultimately closing sometime in the early 80s with Mobil being the last customer.  Nevertheless there is still plenty of evidence of this once relatively busy rural industrial area.

I spent a few days researching & photographing the location recently & have added some photos that may spark some discussion & hopefully some inspiration for others.

The general location of the branch... to the left in the up direction ( just out of shot ) is the station proper
& main line ( down ) to Albury travels out of picture to the right 
         

 The branch leaves the shunting neck just beyond Baxters Boots & another set of points beyond a gate at the start of Bungonia Road marked the entrance to the Mobil Depot...  behind this depot was the Butter Factory which had earlier on one & then two sidings.  Back on the branch proper... it can be seen that the line then serviced another two depots before terminating at the end of the street.  Some locals have told me that the siding extended beyond what is shown above to a sand quarry a little further on but i am yet to find any solid evidence of this at this stage.


Where it all begins... the points to the branch leaving the shunting neck... the main lines in the background
Goulburn Station just out of view in the top right of the photo....behind the photographer is the points serving the Mobil Depot
& branch continuation.  
 


Same location as the last shot athough in the opossite direction with the Mobil siding ( which also served the Butter Factory in earlier days ) curving away to the left & the branch proper at bottom of shot .
 

The most interesting aspect of this shot is the siding which once served the Mobil Depot....once served the Butter Factory located behind the depot.  The shed with roof just visible to the left of the distant telegraph pole now sits on the alignment of the siding extension to the Butter factory.


 

This shot is taken further down the branch extension looking back to the site of the last photo.  The road in the foreground leads from Bungonia Road to the Butter Factory at the rear of the Mobil Depot.  As the branch crosses this access road it also marks the end of any real visible traces of the branch extension beyond this point.







This shot is from Bungonia Rd looking down the access road to the Butter Factory... Mobil perimeter at left with Sophie standing where the branch extension once crossed the access road.  The shed to the mid left is now standing on the Butter Factory siding alignment.







Further on down the access road toward the Butter Factory reveals the remnants of at least one siding. To my left was located a set of points that split the sidings with the visible track serving a small shed used for coal unloading & storage for the boiler  & the other siding to the left leading to a loading dock which is now covered in & its entrance marked by the signwriting on the front wall & some marks in the tar road in front.    







A closer view of the Butter Factory showing where one siding served the now closed in loading dock...which extended the full lenght of the building side.... The coal siding is just visible at bottom right.

To give some idea of the output of this factory... In 1907 under the ownership of the Argyle Cooperative Central Dairy Co. the output for the year was 262.5 tons of butter ( an increase of 10 tons over the previous year ) with 230 boxes of butter being exported to old mother England.

The history of the Butter Factory was a checkered one with it closing & reopening on numerous occasions & this was governed primarily by the farmers moving from dairy operations to wool & beef as the prices ( and expected profits ) fluctuated. Obviously weather & rainfall patterns would have been a governing influence as well.





Another view of the Butter Factory showing the architectural aspects... The dock was used for road transport.
The Butter Factory was also used as a Dairy Farmers milk depot in later years.
It has been the home of York Foods for the last 22 years who have a long association with cooking oils & the building is now used as a manufacturing base for their range of speciality products like Wagyu Dripping etc.... I can attest to the products...Yummy





Looking back up the access road toward Bungonia Rd.  With the alignment of the old loading dock siding now more visible....With the coal delivery siding on the left.  The points were located just beyond the large tree & the siding then
 traversed through the Mobil Depot... back toward the branch junction & main line...





As a closing shot... back in front of the Mobil Depot showing the branch continuation meandering to align itself with the other customers along Bungonia Road...from here the branch extended for another 200 to 300 metres.

In closing i am not sure how unique it is for a branchline to serve another industry requiring shunting through an operational petroleum depot.  It is certainly against all convention.  Some locals tell me it actually happened & some say the storage tanks on the right of the siding were not in existence when the Butter Factory was rail accessed therefore technically it did not happen... Either way it is a nice thought & certainly this location is food for thought when planning layout industry & associated sidings.  I now have compiled a fairly complete history of the Butter Factory & if nothing else it satisfies my want to study the history both rail & social aspects of  interesting locations.