Sunday, 30 December 2012

A New Arrival...

All,

As alluded to in last night's post.... The Timber Water Tank Stand kits are complete & ready to go...Only 6 weeks late!!!....a marathon 4 day & night effort has the first run packed and awaiting their new homes.

A last minute order from the U.S. for a fair quantity of kits, destined for retail sale,  set the cat amongst the pigeons. I am told this style of water tank stand was used in some parts of the U.S. & as a casual observer of happenings over there...I was not in a position to argue the point.  They were added to the manufacturing list... are now on their way & do not impact on the local first run quantity available.


Kit Box Lid Graphics...


There are some details & changes to the kit i would like to cover in this post...

1. The replacement floor for the Casula Hobbies tank ( as discussed in an earlier post ) is now a feature of all kits.  It was just too difficult to predict which tank people would use in the long term... so why not just add it to all kits.

2. The one piece bearer & column assembly has been the main feature of this kit.  As basswood is relatively fragile we have lasered the components incorporating retaining frets & these will be supplied in 2 sheets each containing two assemblies per kit.  This should ensure that the components reach the customer undamaged...As stated in the kit instructions...care & patience needs to be taken when assembling these components as the bearer is oriented across the grain with the columns lasered along the grain.  Across the grain being the fragile plane... The only other option was to supply all the columns & bearers as individual components.  This option would entirely destroy the magic of this kit & would make accuracy in construction very difficult & tedious. When the components are installed to the base & the joists added, a very strong base is the end result.

   


3. The final retail price has caused me some angst & while i hoped to be able to send to market at under $35.00 inclusive... Reality has to come to the fore & we have had to adopt a price of $37.50 with an expectation of sales at around 250 units long term.... So the price will be $37.50....

For the moment we will remain selling on ebay & look at other avenues in the future.  We can announce though that this kit & soon the entire range will be available through Gwydir Valley Models....this should take effect when Warren reopens in mid January.

Kits Earmarked For Warren at Gwydir Valley Models...


For those of you who have emailed during the last few months regarding this kit....please accept this posting as a notice of the impending release of the kit.  We will allow the new year to ring in & then list on ebay around the 2nd January...To give those people a chance to catch up...

These kits are not a "limited edition".... they will be available on a permanent basis & if sales mean we exhaust our stock earlier than anticipated... do not worry there will be more available..... We will also be taking feedback for development of other designs of timber stands... There was plenty of variations & i have a feeling we may have more choices for tanks in the future???!!!

Even though we are a tiny player in the world of model railways...I am excited about this kit & hope that it fills a void in the market & means that all modellers who have had tank kits or completed units laying around in the " to do" bin can look forward to actually installing 1 or 2 completed water tanks & timber stands on their layouts..... It has been an enjoyable experience developing this kit!!!

Now To The Layout Room!!!!

Regards,
Rod
 


  

A Modelling Proposition...With Butter

All,

It has been a while between posts...A fact i have been reminded about quite a number of times.  One email arrived with the subject heading " Is Anybody There" & that was the sum total of the email!!!

The normal lead up to Christmas around here normally means that business drops off around 1st week of December as clients start to get into the festive mood & oil company budgets dry up & does not pick up again until late January... I like it like that!!!  Not so this year & indeed there is still a backlog of work which has only been tempered by an announcement that we were closing until mid January.  While not technically correct...This was the only way to buy some time to get the gestation period of at least one kit finalised & hopefully leave time to catch up with other matters.

To that end i can state that the Timber Elevated Tank Stand kits have been finalised with packing taking place today & should be completed tomorrow... There will be a separate blog post to deal with this issue tomorrow night. 

Now to the reason for this post...

There has been a lot written in the past couple of years about oil or petrol depots from a modelling perspective & this obviously has coincided with the multitude of releases of rail tank wagons.  Like any self respecting layout builder, I will
of course be adding at least 2 or 3 depots on my layout.  These additions will also be a labour of love as most of my earlier working life was spent in petroleum & petrochemical depots & terminals.

In the quest to research what is left of the local depots i came across another industry in Goulburn that was unintentionally intertwined with at least one oil depot.  This fascinating little branch ( should be classified as a twig ) or gaggle of sidings located within a hundred or so metres of Goulburn Station is steeped with industry & does present a very real possibility to be incorporated into at least my layout....

The location is just south of Goulburn Station ( on the down side of the mainline ) & branches off  the still utilised South Shunting Neck...although nowadays this neck really only serves as a non mainline link from the workshops & roundhouse to the yard ajacent to the station proper.  The branch leaves the neck via a facing point to the left, leaves the mainline corridor & travels down the left or eastern side of Bungonia Rd.  The branch once served at least 3 oil depots, a sawtooth shed that once housed an animal skin warehouse & a Butter Factory.

The only remnants left along this branch are the Mobil Depot ( in early days the Vacuum Oil Depot ) & the Butter Factory.  Sadly of course none are now served by rail with the branch truncating over the years & ultimately closing sometime in the early 80s with Mobil being the last customer.  Nevertheless there is still plenty of evidence of this once relatively busy rural industrial area.

I spent a few days researching & photographing the location recently & have added some photos that may spark some discussion & hopefully some inspiration for others.

The general location of the branch... to the left in the up direction ( just out of shot ) is the station proper
& main line ( down ) to Albury travels out of picture to the right 
         

 The branch leaves the shunting neck just beyond Baxters Boots & another set of points beyond a gate at the start of Bungonia Road marked the entrance to the Mobil Depot...  behind this depot was the Butter Factory which had earlier on one & then two sidings.  Back on the branch proper... it can be seen that the line then serviced another two depots before terminating at the end of the street.  Some locals have told me that the siding extended beyond what is shown above to a sand quarry a little further on but i am yet to find any solid evidence of this at this stage.


Where it all begins... the points to the branch leaving the shunting neck... the main lines in the background
Goulburn Station just out of view in the top right of the photo....behind the photographer is the points serving the Mobil Depot
& branch continuation.  
 


Same location as the last shot athough in the opossite direction with the Mobil siding ( which also served the Butter Factory in earlier days ) curving away to the left & the branch proper at bottom of shot .
 

The most interesting aspect of this shot is the siding which once served the Mobil Depot....once served the Butter Factory located behind the depot.  The shed with roof just visible to the left of the distant telegraph pole now sits on the alignment of the siding extension to the Butter factory.


 

This shot is taken further down the branch extension looking back to the site of the last photo.  The road in the foreground leads from Bungonia Road to the Butter Factory at the rear of the Mobil Depot.  As the branch crosses this access road it also marks the end of any real visible traces of the branch extension beyond this point.







This shot is from Bungonia Rd looking down the access road to the Butter Factory... Mobil perimeter at left with Sophie standing where the branch extension once crossed the access road.  The shed to the mid left is now standing on the Butter Factory siding alignment.







Further on down the access road toward the Butter Factory reveals the remnants of at least one siding. To my left was located a set of points that split the sidings with the visible track serving a small shed used for coal unloading & storage for the boiler  & the other siding to the left leading to a loading dock which is now covered in & its entrance marked by the signwriting on the front wall & some marks in the tar road in front.    







A closer view of the Butter Factory showing where one siding served the now closed in loading dock...which extended the full lenght of the building side.... The coal siding is just visible at bottom right.

To give some idea of the output of this factory... In 1907 under the ownership of the Argyle Cooperative Central Dairy Co. the output for the year was 262.5 tons of butter ( an increase of 10 tons over the previous year ) with 230 boxes of butter being exported to old mother England.

The history of the Butter Factory was a checkered one with it closing & reopening on numerous occasions & this was governed primarily by the farmers moving from dairy operations to wool & beef as the prices ( and expected profits ) fluctuated. Obviously weather & rainfall patterns would have been a governing influence as well.





Another view of the Butter Factory showing the architectural aspects... The dock was used for road transport.
The Butter Factory was also used as a Dairy Farmers milk depot in later years.
It has been the home of York Foods for the last 22 years who have a long association with cooking oils & the building is now used as a manufacturing base for their range of speciality products like Wagyu Dripping etc.... I can attest to the products...Yummy





Looking back up the access road toward Bungonia Rd.  With the alignment of the old loading dock siding now more visible....With the coal delivery siding on the left.  The points were located just beyond the large tree & the siding then
 traversed through the Mobil Depot... back toward the branch junction & main line...





As a closing shot... back in front of the Mobil Depot showing the branch continuation meandering to align itself with the other customers along Bungonia Road...from here the branch extended for another 200 to 300 metres.

In closing i am not sure how unique it is for a branchline to serve another industry requiring shunting through an operational petroleum depot.  It is certainly against all convention.  Some locals tell me it actually happened & some say the storage tanks on the right of the siding were not in existence when the Butter Factory was rail accessed therefore technically it did not happen... Either way it is a nice thought & certainly this location is food for thought when planning layout industry & associated sidings.  I now have compiled a fairly complete history of the Butter Factory & if nothing else it satisfies my want to study the history both rail & social aspects of  interesting locations.